A Kiosk at ‘The Cage’

20201120_173957

‘The Cage’ a Football and Futsal Venue at Beverly Hills required the long term use of a strong, sturdy and ultimately secure kiosk to serve food and beverages to hungry players and spectators alike. Providing over 15.8m3 of usable space with a non-slip easy clean floor, insulated walls and ceiling, power and lighting, fold out […]

Tomra Mining Solutions

Tomra Mines5

Tomra Mining approached Price and Speed Containers modification division with the brief of building a solid, portable yet secure control facility for a mining site in New Caledonia. The design required the use of two 40ft containers stacked one on top of the other and a single 20ft container partitioned as an office and storage […]

HBB Property – providing an End to End Solution

20200805_081059

Custom container solutions are our specialty which is why HBB Property Group approached us to develop them a secure on site Meeting Room, Site Office and Store Room. Initial development started with our container modification team member Matt providing a thorough consultation of the requirements and design needs with the client. Our highly skilled and […]

Small Size, Big Sound Proofed Solution

John_Holland_10ft_Price_and_Speed_Sound_Proofed

Sometimes the biggest and best solutions come in small packages and that is exactly what John Holland Group needed. They approached us with a brief for a solution that was air conditioned and well sound proofed yet was small enough to move easily into position and took up very little space. We used a quality […]